
Paul McAlister’s groundbreaking CREST (Centre for Renewable Energy and Sustainable Technologies) in Enniskillen has scooped up the Sustainable Building Project of the Year accolade at the Sustainable Ireland awards – before it has even opened.
CREST is the first commercial passive building in Northern Ireland – designed to be ultra energy efficient to reduce its ecological footprint as much as possible.The team designed the building in accordance with the six principles of passive house design – superinsulation; triple-glazing; air tightness; mechanical ventilation and heat recovery; minimised thermal bridging and orientation for passive solar gain.
The pavilion was built on a brown field site using low environmental impact materials. It is heated with an air source heat pump and lit with low energy LED lighting powered by PV panels. Daylight sensors and automatic controls regulate lighting, while rainwater is collected from the roof and recycled to flush the toilets. Meanwhile, the largest area of glazing faces south, allowing heat from the sun to pour into the building.
Sean McCarron, contracts manager at building contractors PJ Treacy and Sons, said:
“We live in an age of increasing demand for sustainable buildings and, as proven by the CREST pavilion, we can certainly play our part in meeting this demand to exacting standards.”

