Grid power demand peaks and increasing supply/demand inbalances create management challenges for utilities. These
challenges are increasingly being resolved using non-
“supply side” solutions. While the use of curtailable load in
Demand Response (DR) applications is a powerful solution
in managing the problem of grid load peaks, it is not without
its challenges. Delivering DR from commercial, industrial
and institutional (C/I/I) buildings can be difficult, costly and
risky for building owners. DR participation from these
electricity customers can be unreliable and unpredictable
unless the right tools, processes, economic incentives,
systems and training are in place.
Use of the thermal mass of a building in the C/I/I markets
can be used as a reliable and predictable source of system
DR capacity. This paper will discuss how automated and
optimized DR technology can build and implement accurate relationships between DR lead time, incentives, DR
duration, external environmental conditions and building
occupancy by understanding the HVAC capacity and
thermal characteristics of a building. New technologies
provide utilities better insight into available customer DR
resources. These new technologies automatically inform
utilities the future load profiles of buildings enrolled in DR
programs – allowing utilities to better plan grid operations
before a critical peak event occurs.